Page d'Accueil
 
Français
English
 
 
  g La SMB
»  
 
 
SEARCH :  

On the initiative of Félix Houphouët Boigny, then President of the Republic of Côte d’Ivoire, the Council of Ministers at its session of 3 March 1976 authorized PETROCI to build a bitumen production plant through the Société Multinationale de Bitumes (SMB).

This decision was part of the general policy of President FHB consisting in reducing regional distortions through the implementation of a road programme enabling to bring closer regions more remote from development centres.

In April 1976 a call for tenders launched by the PETROCI’s Research and Design Departements, following examination of the bids, has resulted in the selection of the selection of the Compagnie Française d’Etudes et de Construction TECHNIP to implement a turnkey contract for the construction of the SMB plant.
The Petroleum Plant has been supplied by French Companies and many Ivoirians Companies have taken part in its construction.
The main stages in construction and start up are summed up in the following five dates:

  1. 27 September 1976: signing of the contract between SMB and TECHNIP
  2. 12 January 1977 : Laying of the foundation stone by EL Hadj Mamadou Coulibaly, President of the Economic and Social council.
  3. 15 February 1977: Commencement of site work
  4. 30 March 1978: Completion of construction in accordance with the original schedule.
  5. 22 April 1978: Start-up of plant operation by a team of young Ivoirians trained for the purpose.


Welcoming words | Historical background | Objectives | Organisations | Logistic


Warning: Access denied for user: 'root@localhost' (Using password: YES) in /usr/local/www/vhosts/smbci.ci/htdocs/DBFiles/adodb/adodb-mysql.inc.php on line 113
 
 
© SMB 2005
 
Powered by Digital-Afrique Telecom